Vaughan · Alectra Utilities service area
Level 2 EV chargers for Vaughan garages and driveways
Two-car households are the norm in Vaughan, and more of them now have one electric car or two. We install Level 2 chargers so both can charge overnight without tripping the main breaker.
Two cars, one panel
Why Vaughan chargers need a plan
Vaughan was built around the car. Many detached homes in Maple, Vellore Village, Patterson and Sonoma Heights have an attached double garage and a driveway wide enough for two. That makes charging easy to place. It also means many households end up wanting two chargers, not one.
A Level 2 charger is one of the biggest loads a house will ever have, running for hours at a time. Two of them, on top of central air and a basement kitchen, can push a 100 or 200 amp service past what it was built for. The fix is usually not a bigger service. It's a charger setup that shares capacity sensibly.
We start with a load calculation on your actual house. Then we recommend one circuit, two circuits, a shared circuit or a load management device, and explain why.
Where the charger goes
Common Vaughan layouts
| What it usually involves | Watch for | |
|---|---|---|
| Panel on the garage wall | A short run straight to the charger | Spare spaces in the panel |
| Panel across the basement | A longer run through the basement ceiling into the garage | Finished ceilings and the cable size for the distance |
| Freehold townhouse | A run from a basement panel to a front garage | A smaller service that may need load management |
| Driveway, no garage | An outdoor-rated charger on the wall or a post | Weatherproof wiring and where the cable reaches the car |
Install day
From panel check to first charge
Photos first
Send us the panel, the main breaker and the spot you want the charger.
Site visit and load check
We confirm the route and whether the panel can take the new circuit.
Written price
Circuit, charger mounting, permit and any load management in one figure.
Install
Most home installs take a few hours. Power to the house stays on for most of it.
Inspection
We file the ESA permit, ESA inspects the work, and you plug in.
New builds and condos
EV-ready homes and buildings
Buyers in Vaughan's newest subdivisions sometimes asked their builder for an EV-ready garage, and sometimes didn't. If yours has a capped 240-volt outlet or a conduit to the garage, the job is quicker. If not, we add the circuit to a finished house.
Condo owners near the Vaughan Metropolitan Centre need the board and management on side before any charger goes in. The supply comes from the building's electrical room. We can work with management on the electrical side. For builders planning EV-ready garages in Kleinburg custom homes, it's best settled at the drawing stage.
Want the general picture first? See EV charger installation. If your panel is already full, read about panel upgrades in Vaughan.
Questions
EV chargers in Vaughan: questions
Can I charge two EVs on my Vaughan home's panel?
Often, yes. Two chargers don't always need two full circuits. Some chargers can share one circuit between them, and a load management device can pause charging when the house is busy. We do a load calculation first and tell you which setup your service supports.
My panel is on the far side of the house from the garage. Is that a problem?
It makes the cable run longer, not impossible. In most Vaughan homes we route through the basement ceiling or a utility room and into the garage. Longer runs may need a heavier cable, which we include in the quote after seeing the route.
Should the charger be hardwired or plugged in?
Both work. A plug-in charger uses a 240-volt receptacle and is easy to take with you if you move. A hardwired charger is fixed to the wall and is the usual choice outdoors or at higher charging rates. We'll match the circuit to the charger you pick.
Do you take out the ESA permit?
Yes. In Ontario, the licensed contractor files the notification of work with the Electrical Safety Authority (ESA) and books the inspection. We handle it on every job that needs one, and you get the ESA Certificate of Acceptance when the work passes. Keep it: insurers and home buyers often ask for it.
More in Vaughan