Alliston · Alectra Utilities service area

Electrical panel and service upgrades in Alliston and New Tecumseth

An older house near downtown Alliston, a 1990s home in Tottenham and a farmhouse near Colgan each outgrow their panels differently. We size the new service, file the ESA permit and book the utility.

60A FUSES MAIN 200A METER SERVICE UPGRADE 60A → 200A PANEL · ESA PERMIT
Panel upgrades in Alliston
Utility
Alectra Utilities
Region
Simcoe County
Typical upgrade
100A to 200A
Price
Fixed, after a site visit
Permit
ESA, filed by us

Why panels fall short here

Town houses, new streets and farm loads

On the older streets of Alliston, Beeton and Tottenham, plenty of houses still run on a 60 or 100 amp service. Some have a fuse box. Others have an early breaker panel that has been extended with tandem breakers until no space is left. An insurer or a buyer's inspector is often the first to flag it.

In the subdivisions built since the 1990s, the panel is usually sound but small for how the house is used now. A finished basement, central air, a hot tub and an EV can all land on a service sized for none of them.

Rural properties carry loads a town house never sees. A well pump, a shop with a welder or compressor, a heated barn and electric baseboard heat can share one service. Sizing has to start with everything fed from the meter, not just the house.

By property

How an upgrade differs across New Tecumseth

Where the power comes in decides most of the day's work.

Service upgrades in town and rural New Tecumseth
Older town streetsNewer subdivisionsRural lots
How power arrivesOften overhead, to a mast on the houseUsually underground to the meter baseOverhead or underground, sometimes to a yard pole
What we tend to findFuses or a crowded early panelA 100 amp panel with no spare spacesOne service feeding the house and outbuildings
Usual reason to callInsurance, a sale or a renovationA charger, heat pump or basementA shop, barn, generator or new heating
Extra checksGrounding and the mastRoom for future circuitsFeeder sizes and grounding at each building

Upgrade day

How a New Tecumseth service upgrade is scheduled

The utility date and the permit are set before anyone drives up.

  1. Site visit and load calculation

    We look at the meter, the panel and every building fed from them, then size the service.

  2. One written price

    Equipment, labour, ESA permit, utility booking and travel time, each listed.

  3. Permit filed, date booked

    We file the notification of work with ESA and book the disconnect with the utility.

  4. The change-over

    Power off in the morning, new service equipment in, each circuit moved and labelled.

  5. Inspection and reconnect

    ESA inspects, the utility restores power, and your Certificate of Acceptance follows.

The scope

What a complete upgrade includes

  1. Load calculationIncluding outbuildings, a well pump and any charger or heat pump you plan
  2. New panel and main breakerUsually 200 amps, with spare spaces for later
  3. Meter base and service entranceMast and weatherhead where the supply is overhead
  4. Grounding and bondingBrought up to current rules at the house
  5. Circuit directoryEvery breaker traced and named in plain words
  6. ESA permit and inspectionFiled and booked by us

If a charger is on your list, fitting its circuit on upgrade day saves a second trip. See EV chargers in Alliston. For how we handle upgrades everywhere we work, read the main panel upgrades page, or go back to our Alliston service area.

Questions

Panel upgrades in Alliston: questions

Our farmhouse meter is on a pole in the yard. Does that change the upgrade?

It changes the plan, not the idea. The new service is sized for the house and every building fed from that pole. We also check the feeders to each building, since an upgrade at the pole does little if a feeder is undersized. The site visit settles the layout before you get a price.

Who books the shut-off in Beeton or Tottenham?

We do. In the towns that means Alectra Utilities. Some rural properties are on Hydro One, and your bill tells us which. Once the ESA permit is filed, we request the disconnect and reconnect and confirm the date with you.

We want a heat pump. Will our panel need to change first?

Sometimes. A heat pump adds a large 240-volt load, and so does its backup heat. If the house already has a charger, a hot tub or electric water heating, a 100 amp service can be short. A load calculation answers it before you order equipment.

How long is the power off during a panel upgrade?

Usually most of one working day. The utility disconnects the service in the morning, we swap the panel and service equipment, and power is reconnected once the work is ready. We book the utility appointment for you and tell you the date in advance.

More in Alliston

Other services in Alliston

Read more

Get a price in Alliston

1About you

2Where the work is

3What you need

Services pick all that apply

We reply within 30 minutes during office hours. For an emergency, call (647) 930-2907.

Call(647) 930-2907 Text Get a priceGet a price range