Etobicoke · Toronto Hydro service area

Electrical service upgrades for Etobicoke homes

A panel change in a 1930s Kingsway house differs from one in a Long Branch bungalow or a Markland Wood split-level. We size the new service to your home and your plans, then book Toronto Hydro and ESA for you.

60A FUSES MAIN 200A METER SERVICE UPGRADE 60A → 200A PANEL · ESA PERMIT
Panel upgrades in Etobicoke
Utility
Toronto Hydro
Housing
1930s brick to 1960s splits
Price
Fixed and written, after a visit
Permit
ESA, filed by us
Warranty
1-year workmanship

Why Etobicoke panels vary

Three eras of house, three starting points

Etobicoke grew in stages, and each stage left a different kind of panel behind. In the Kingsway, Humber Valley Village and Princess-Rosethorn, solid brick houses from the 1930s and 40s were built long before anyone owned a dishwasher. Most have been updated since, but often one piece at a time.

On those streets the panel may be newer than the wiring behind it, and the service size may never have changed. A tidy breaker panel from the 1980s can still be a 100 amp service with every slot taken. It looks modern and has no room left.

Along the lakeshore, Mimico, New Toronto, Long Branch and Alderwood are full of compact post-war bungalows. Plenty of them still run on the 60 or 100 amps they were built with. Further north, Markland Wood, Thistletown and Rexdale filled in during the 1950s and 60s with bungalows and split-levels. Their original panels are now old enough that replacement parts can be hard to find.

What usually triggers the call

In the older south and centre, it's a renovation: a new kitchen, an addition, or a basement turned into living space. In the north end, it's often an insurer asking about the panel's age, or breakers that trip whenever the air conditioner starts.

By part of Etobicoke

What an upgrade tends to involve

Every house is checked on site, but these patterns come up again and again.

Panel upgrades across Etobicoke's housing
AreaTypical homeWhat we often plan for
The Kingsway, Humber Valley Village, Princess-Rosethorn1930s and 40s brick, renovated in stagesTracing a mix of wiring ages before circuits move, plaster finishes, a panel sized for a large renovation
Mimico, New Toronto, Long Branch, AlderwoodPost-war bungalows on wider lots60 or 100 amp service going to 200, room for a basement and a car charger
Markland Wood, Thistletown, Rexdale1950s and 60s bungalows and split-levelsReplacing an original panel, labelling circuits that were never mapped, adding space for central air
Islington Village, EdenbridgeLarger detached homes, some rebuiltBigger loads such as heated floors and pool equipment, sometimes more than one panel

The day itself

How an Etobicoke service change runs

  1. Visit and load calculation

    We look at the meter, the service entrance and the panel, and add up what the house uses now and later.

  2. Fixed price in writing

    Equipment, labour, the ESA filing and the Toronto Hydro request, all in one number.

  3. Utility date

    We ask Toronto Hydro for the disconnect and reconnect and confirm the date with you.

  4. Swap

    Power goes off in the morning. The new service equipment and panel go in, and each circuit is moved and labelled.

  5. Inspection and power back

    ESA inspects and authorizes the connection, Toronto Hydro reconnects, and you keep the Certificate of Acceptance.

Storm season

Plan for the creeks while the panel is open

The Humber River, Mimico Creek and Etobicoke Creek all cut through the borough on their way to the lake. Heavy summer storms can bring a power cut and a wet basement in the same evening, especially in low-lying homes. That makes the sump pump one of the most important circuits in the house.

A panel upgrade is the cheapest moment to prepare for that. We can give the sump pump its own labelled circuit and leave space for a generator transfer switch. Surge protection can go in at the panel too. See backup generators in Etobicoke if you want the pump to keep running through an outage.

  1. Load calculationBased on the house now and the work you have planned
  2. New 200 amp panel and main breakerWith spare spaces left for later
  3. Meter base and service entranceIncluding the mast on overhead services
  4. Grounding and bondingChecked and brought up to current rules
  5. A written panel directoryEvery circuit traced and named
  6. ESA filing and inspectionEnding with the Certificate of Acceptance

For the full city-wide picture, see our panel upgrades page.

Questions

Panel upgrades in Etobicoke: questions

My Kingsway house had its panel replaced years ago. Could it still need an upgrade?

It can. Many older Etobicoke homes had a panel swap decades ago that kept the same 100 amp service. That was fine then, but a renovated kitchen, central air and a charger can use it up. A load calculation tells you whether there's headroom left.

We're finishing the basement of our Alderwood bungalow. Should the panel come first?

Usually, yes. The basement circuits then go straight into the new panel and are inspected once. If the bungalow is still on 60 or 100 amps, the finished basement is often what tips the load over the limit.

Who books the Toronto Hydro disconnect for an Etobicoke upgrade?

We do. All of Etobicoke is Toronto Hydro territory. We request the disconnect and reconnect, plan the day around their crew and tell you the date. ESA has to authorize the connection before Toronto Hydro restores power.

How long is the power off during a panel upgrade?

Usually most of one working day. The utility disconnects the service in the morning, we swap the panel and service equipment, and power is reconnected once the work is ready. We book the utility appointment for you and tell you the date in advance.

More in Etobicoke

Other services in Etobicoke

Read more

Get a price in Etobicoke

1About you

2Where the work is

3What you need

Services pick all that apply

We reply within 30 minutes during office hours. For an emergency, call (647) 930-2907.

Call(647) 930-2907 Text Get a priceGet a price range